Scope of work

What we put in the ground.

Grading, storm drainage, sewer, water, clearing, curb and gutter, pavement markings, and asphalt paving.

Dozer trimming a grass slope while a truck loads out material.
01Grade

Site grading

Rough grade and finish grade to the elevations on the civil plan. Cut, fill, slope, and a building pad that sends water away from the structure instead of into it.

Matthew McClain is the surveyor on staff. The grade is checked against the drawings.

Concrete catch basin and curb inlet at the edge of new asphalt, with a silt fence behind it.
02Storm

Storm drainage

Catch basins, manholes, pipe, and the structures that get surface water off the lot. The inlet elevation and the curb elevation are the same conversation.

If the water misses the structure, it sits in the stone and the asphalt fails from underneath. Drainage is not a cleanup trade at the end of the job.

Concrete pipe staged along a graded utility corridor beside a road.
03Sewer

Sewer

Sanitary sewer installed to the plan: trench, pipe, structures, and backfill a paving crew can build on. The line has to hold grade, and the trench has to come back tight.

We coordinate the sewer corridor with storm, water, and the finished surface so the later trades are not digging up a pipe that was set in the wrong place.

Open utility trench with a worker guiding an excavator bucket.
04Water

Water

Water main and service lines in the same dirt as the rest of the utilities. Depth, separation, and the path back to finished grade are part of the bid, not a field surprise.

Send the utility sheets with the grading plan. Pricing one without the other is how corridors get crossed twice.

Cleared commercial site with an excavator working the initial grade and a building in the background.
05Lexington Marketplace

Clearing

Clearing and grubbing so the grading crew has dirt, not timber, under the tracks. Brush, trees, and stumps come off before the cut and fill starts.

New curb and gutter along a fresh asphalt road, with string line still up.
06Curb

Curb and gutter

Concrete curb and gutter that holds the edge of the pavement and carries stormwater to the inlets. Line, grade, and a face the asphalt can lock against.

This is where the grading plan becomes something a driver can see. If the curb is wrong, the lot drains wrong.

Parking lot getting fresh white stall stripes, stops, and arrows.
07Academy Sports

Pavement markings

Striping on finished asphalt: stalls, arrows, stops, crosswalks, and the legends the plan calls for. The lot has to read the way it was drawn.

Markings are the last thing the public sees, and the first thing a punch list mentions.

Asphalt paver and roller working a new road lane.
08Asphalt

Asphalt paving

Asphalt placed on a subgrade that was built for it. The paving crew inherits the grade, the stone, the curb, and the drainage. Those have to be right before the first truck dumps.

Roads, drives, and lots. If you want the whole site package priced together, say so on the bid form and attach the paving sheets with the grading plan.